26 February, 2011

Refrigerator Seal

Today the temperatures were in the low 30's, so we decided to do some work below. We installed a new seal on the refrigerator - the old one was at end of life.



24 February, 2011

Aloft!

Since I unexpectedly went up the mast the last time, Geralyn agreed to go up the mast the next opportunity. Here's Geralyn going aloft.



14 February, 2011

This Weekend's Projects

This weekend, we installed Hypervent in the forward stateroom to prevent condensation, lubricated the Selden Furlex, cleaned the navigation light housings, cleaned battery contacts, rerigged the reefing lines, adjusted the lifelines and took time to say hello to some marina visitors, a couple of Mallard ducks and Canadian geese.

06 February, 2011

New Diesel Heater Exhaust

This weekend, we installed the new heater exhaust. The new hose was too long, so I had to cut it about 4-5 inches shorter. We're pretty happy with the way it turned out, and the heater works great.

04 February, 2011

Blue

We've been running into this Blue Heron on the way to the boat. He's very alert and watches us until we are well and away. We call him "Blue".

Rusted Hose Clamp

I found another picture of the rusted heater exhaust hose clamp.

02 February, 2011

Wallas Exhaust Cleanup Project

Our Wallas Nautic 40D diesel heater exhaust had been rusting at the heater end and at the through-hull end. The through-hull end was rusting so badly, it was dripping rust on the inside of the hull. The through-hull hose clamp was so rusted, it came off when I touched it. The heater end wasn't too bad. One brand of hose clamps fared better than the other, so I've taken note of the rusty brand and the good brand. We have no diesel heat while we wait for a shipment of flexible exhaust pipe and a fiberglass sock from Scanmarine. I can't say enough good things about Scanmarine. They support a fantastic product with great customer service.